Roadmap
This milestone is complete when the high level design of the system is complete. This includes the two critical software interfaces as well as the requirements, architecture, and design documents.
This milestone is complete when a prototype raw generator has been built and tested successfully to generate random looking bits.
This milestone is complete when the Driver can communicate with the Generator over the USB Link.
This milestone is complete when the statistical testing component is operational and the generator passes the tests.
Milestone: Final Presentation
Due in 2 months (04/29/2021 11:59:00 PM)