Roadmap

Milestone: Design

Due in 5 weeks (12/31/2020 10:59:00 PM)

43%

Number of tickets:
closed:
3
active:
4
Total:
7

This milestone is complete when the high level design of the system is complete. This includes the two critical software interfaces as well as the requirements, architecture, and design documents.

Milestone: Raw Generator

Due in 2 months (01/31/2021 10:59:00 PM)

50%

Number of tickets:
closed:
1
active:
1
Total:
2

This milestone is complete when a prototype raw generator has been built and tested successfully to generate random looking bits.

Milestone: Link

Due in 3 months (02/19/2021 10:59:00 PM)

33%

Number of tickets:
closed:
1
active:
2
Total:
3

This milestone is complete when the Driver can communicate with the Generator over the USB Link.

Milestone: Statistical Tests

Due in 4 months (03/25/2021 11:59:00 PM)

33%

Number of tickets:
closed:
1
active:
2
Total:
3

This milestone is complete when the statistical testing component is operational and the generator passes the tests.

Milestone: Final Presentation

Due in 5 months (04/29/2021 11:59:00 PM)